Establishment Goals - after investment:

2012 - 90 MW


2013-140 MW


2014-200 MW


2015-270 MW


2016-300 MW

 


1000 MW during the next 5 years


 

3. Changing the game rules


In the past, the significant players in the European market were:

  1. Licenses Developers;
  2. Engineering procurement and construction – EPC;
  3. Investor / Entrepreneur for the construction period;
  4. Financial investor who will eventually purchase connected to the grid system low extremeness;


SBY will unify A-C unification steps that include: developing of the licensing, EPC and financing the construction phase that enables increased efficiency, better investment returns, and control of projects from the initial phase. This consolidation also allows increased investment in developing licensing in several countries simultaneously (especially in developing countries - such as Africa) – will substantially lower the risk.
Current market prices lead to an absurd situation where the cost of the license stands at 300-400 € - as well as the EPC profits - profits that are added to the developer's costs, and does not allow the financial investment fund profitable low cost purchase with profitability of 15% on the equity.


The global economic crisis changed the game and decreased prices allowing competition with conventional electricity, while a landmark road will be the GRID PARITY.
Reality will require the Developer / EPC to be more efficient, more professional and able to withstand a variety of projects totaling 300-1500 Kwp medium and long-term projects consisting of 20-50 MW. The Union between Developer, as well as the EPC and the Investor (Panels Manufacturer) allows minimal capital expenditure during the construction period - through bank financing of local banks or Chinese - when the intent is to sell the project is connected to a larger space.